Latest Projects

Lloyd Lanes – NEW!!!! 5/10 Pin Bowling Alley

Craftex Builders has been very excited for this opportunity to work on the NEW 5/10 pin bowling alley that  opened in February 2018. There have been a few great articles written in the source since the project began in August 2017. Check out these great articles and go check out their facebook page for more information: Article 1: www.lloydminstersource.com/articles/article/2017-03-23-secrecy-surrounds-bowling-lanes Article 2: www.lloydminstersource.com/articles/article/2018-01-17-lloyd-lanes-rolling-on-schedule Facebook: www.facebook.com/Lloyd-Lanes-Bowling-Alley-280447159051274/

Lloydminster COOP Agro Interior Renovation

The project consisted of the interior and exterior renovation of the retail store, site work, concrete pads and ramps requiring but not limited to demolition of interior framing, roofing, plumbing, electrical, HVAC elements, exterior storefront, glazing, fencing and concrete. The work involved the construction of new offices, boardroom, staff room, all associated millwork and finishes. Also included was removal and replacement of concrete aprons as well as new concrete ramps. Portions of exterior metal cladding to be replaced with new EIFS and Cultured Stone, select areas of metal cladding to be patched. Completed December 2018

Farm Credit Canada Interior Renovation

This project involved general interior building construction. The area of work was approximately 460m2 (4951ft2). The building is located on the Saskatchewan side of Lloydminster With a scope of work of: Miscellaneous carpentry work, metal stud/drywall, wood and hollow metal steel doors, wood and pressed steel doors and frames, finishing hardware, interior and exterior glazing, carpeting, resilient flooring, painting, and mechanical and electrical. Completed January 2018

Dairy Queen Renovation

This project is the renovation to the existing Dairy Queen, consisting of exterior site upgrades, new exterior finishes, interior renovation with new interior design.

Border City Concrete ‘Batch Plant’ – Past Project

The original proposed construction of Border City Concrete has been revised into a two phase construction project with an overall project completion date for both phases in the year 2017. The following is a brief overview of each phase. Phase One Construction: 2016/2017 Site Work Batch Mixing Plant Equipment Installation Pre-Eng Building Erection Phase Two Construction: Potential 2018 Start Date Pre-Eng Building Shop Steel Office Building Site Work & Landscaping Border City Concrete has some new features that we are working closely with the owner and our design team to ensure we meet all operation requirements. With two giant

Sleep Country Interior Fit Up – Past Project

Craftex Builders was awarded the tender bid for Sleep Country – Interior Fit Up project. Working along with Dama Construction out of Dorval, Quebec this project schedule from start to finish was roughly 8 weeks. The interior fit up requirements for this well known business chain consisted of installation of interior partitions, washrooms, painting, acoustical ceiling, hanging displays, millwork and shelving units for the tenant. The project provided a couple of unique challenging tasks as Craftex worked along with Dama Construction on the Fillmore Construction site located in front of Superstore. We are extremely happy with the overall finish product. You

LBB Holdings – Past Project

LBB Holdings will be 12,000 sqft of beautiful cladding with tower like features made of stonework. The building can accompany two tenants and will have both office space and shop space.

Napa Auto Parts – Past Project

We are pleased to announce an addition to the leading automotive parts and accessories supplier. The new Napa Auto Parts building will be 14,000 sqft, it will be a pre-engineered steel building with curtain walls and buildouts. It will consist of Napa blue cladding and accent stone.

Past Projects

  • Nov Mono,
  • E2 Engineering,
  • Craftex Builders – Current Office,
  • A-Plus Machining,
  • Point Gray Center,
  • Fisher Building Systems,
  • Doull Site Assessments,
  • Windsor Plywood Addition,
  • Lashburn CN Communiplex – Interior Renovation,
  • Pure Vibe Studio – Interior Renovation,
  • LPSD Jack Kemp – Portable Addition,
  • LPSD LCHS – Locker Room Addition,
  • St. Walburg Communiplex – Renovations,
  • Wainwright Provincial Building – Interior Renovation,
  • Wainwright Blessed Sacrament School – Portable Addition,
  • CFB Wainwright Parade Dias 
  • Wainwright Blessed Sacrament School – Portable Classroom and Washroom Addition 
  • City of Lloydminster – Amphitheater Improvement 
  • Lloydminster Co-Op – Pharmacy Renovation
  • Synergy Credit Union – Lashburn Branch Renovation 
  • Alberta Infrastructure – Child Services Lloydminster 
  • LPSD – E.S Laird Staff Room Relocation 
  • LPSD – Queen E School Flooring Replacement 
  • Synergy Credit Union – Kindersley Branch Renovation 
  • Synergy Credit Union – Paradise Hill Renovation 
  • City of Lloydminster – Bud Miller Picnic Shelter Refresh
  • LPSD – Bishop Lloyd Flooring Replacement