The original proposed construction of Border City Concrete has been revised into a two phase construction project with an overall project completion date for both phases in the year 2017. The following is a brief overview of each phase.
Phase One Construction: 2016/2017
Phase Two Construction: Potential 2018 Start Date
Border City Concrete has some new features that we are working closely with the owner and our design team to ensure we meet all operation requirements. With two giant 200 tons silo’s towering over the area we needed to have some massive concrete piles deep into the ground to be to handle the required loads to support them when full. Two center piles out of 10 that are required measuring 4′-0″ in diameter and 52′-0″ deep. Extra safety precautions were needed to be made to ensure everyone’s safety when drilling and placing these massive piles.
This project is the renovation to the existing Dairy Queen, consisting of exterior site upgrades, new exterior finishes, interior renovation with new interior design.
This project involved general interior building construction. The area of work was approximately 460m2 (4951ft2). The
building is located on the Saskatchewan side of Lloydminster
With a scope of work of:
Miscellaneous carpentry work, metal stud/drywall, wood and hollow metal steel doors, wood and pressed steel doors
and frames, finishing hardware, interior and exterior glazing, carpeting, resilient flooring, painting, and mechanical and
electrical.
Completed January 2018
LBB Holdings will be 12,000 sqft of beautiful cladding with tower like features made of stonework. The building can accompany two tenants and will have both office space and shop space.
Craftex Builders has been very excited for this opportunity to work on the NEW 5/10 pin bowling alley that opened in February 2018. There have been a few great articles written in the source since the project began in August 2017.
Check out these great articles and go check out their facebook page for more information:
Article 1:
www.lloydminstersource.com/articles/article/2017-03-23-secrecy-surrounds-bowling-lanes
Article 2:
www.lloydminstersource.com/articles/article/2018-01-17-lloyd-lanes-rolling-on-schedule
Facebook:
www.facebook.com/Lloyd-Lanes-Bowling-Alley-280447159051274/
The project consisted of the interior and exterior renovation of the retail store, site work, concrete
pads and ramps requiring but not limited to demolition of interior framing, roofing, plumbing,
electrical, HVAC elements, exterior storefront, glazing, fencing and concrete.
The work involved the construction of new offices, boardroom, staff room, all associated
millwork and finishes. Also included was removal and replacement of concrete aprons as well as
new concrete ramps. Portions of exterior metal cladding to be replaced with new EIFS and
Cultured Stone, select areas of metal cladding to be patched.
Completed December 2018
We are pleased to announce an addition to the leading automotive parts and accessories supplier. The new Napa Auto Parts building will be 14,000 sqft, it will be a pre-engineered steel building with curtain walls and buildouts. It will consist of Napa blue cladding and accent stone.
Craftex Builders was awarded the tender bid for Sleep Country – Interior Fit Up project. Working along with Dama Construction out of Dorval, Quebec this project schedule from start to finish was roughly 8 weeks. The interior fit up requirements for this well known business chain consisted of installation of interior partitions, washrooms, painting, acoustical ceiling, hanging displays, millwork and shelving units for the tenant. The project provided a couple of unique challenging tasks as Craftex worked along with Dama Construction on the Fillmore Construction site located in front of Superstore. We are extremely happy with the overall finish product. You should get yourself down Sleep Country to improve your sleep quality.